A SINOVO reverse circulation drilling rig was packed and shipped to Malaysia on June 16.
"The time is tight and the task is heavy. It happens that during the epidemic, it is very difficult to complete the production of the rig and successfully send it to overseas projects!" When the task was contracted, this was the emergence of every employee Thoughts in mind.
In the face of difficulties, sinovo worked overtime to make, assemble and debug configurations required by customers, so as to ensure the optimal performance of the products. In order to ensure that the quality and progress are under control, special personnel are arranged for on-site tracking, actively docking with customers, customs declaration and delivery, and promoting the smooth progress of the overall work.
In recent years, sinovo has actively explored overseas markets, deepened cooperation with countries along the Belt and Road, based on industrial upgrades, and promoted the export of various types of pile driver machinery products. The signing of a cooperation project with a Malaysian customer is the result of mutual trust between the two parties and will surely inject strong confidence and momentum into the solemn heavy industry's production and operation.